Projects

Niagara Falls Air Reserve Station

Niagara Falls Air Reserve Station-Taxiway Repairs

A 2-phase project requiring coordination with FAA and Government officials to not interfere with daily operations of the air base.

Aerial Port

Grissom Air Reserve Base-Aerial Port Facility

New construction of a 11,830 SF masonry Aerial Port Facility, including include shop space, warehouse space...

Niagara Falls Air Reserve Station-Physical Fitness Facility

Construction of a new 24,906 sf physical fitness facility including a lobby, administrative areas, locker rooms...

Fort Riley-Building 760 Renovations

Fort Riley-Building 760 Renovations

Renovate historic building 760 to meet anti-terrorism and force protection (ATFP) requirements, including new fire protection...

Grissom Air Reserve Base-Repair of Taxiway C

Grissom Air Reserve Base-Repair of Taxiway C

Replacement of existing Taxiway C between Taxiway G and Runway 5-23, including intersecting segment of Taxiway F...

Fort Riley-Aircraft Parts Storage Warehouse CAB

Fort Riley-Aircraft Parts Storage Warehouse CAB

Supply and coordination of a 10,088 sf pre-engineered building to be erected adjacent to Building 840 following the demolition...

Del Rio/Eagle Pass Design

Del Rio/Eagle Pass Design/Build Border Infrastructure Project

A design build project incorporating the demolition of approximately 4 miles of existing picket style fencing...

38 IC LLC Design/Build New Facility

38 IC LLC Design/Build New Facility

Project includes converting a 15,000 s.f warehouse int a full-service heavy truck maintenance facility including...

Grissom Air Reserve

48 NMJT LLC Design/Build Site Improvements

Project includes relocation of site lighting, installation of new curbing and paving, signage striping to create...

19 IC LLC Design/Build Site Expansion

19 IC LLC Design/Build Site Expansion

Project includes acquiring additional real estate to meet NJDEP Stormwater regulations, the installation...

JBMDL-Concrete and Masonry Contractor

New building construction for a Youth Center; excavation, earthwork, and formwork for concrete foundations and building slab.

Build New Facility

Kerry Ct-Design/Build New Facility

Construction of a new 21,000 S.F office/warehouse facility including clearing of site.

Joint Base McGuire-Dix-Lakehurst Youth Annex Building

Construction of new 16,260 square foot facility that will provide 168 school-aged children between the ages of ...

NACOM project scope included demolition of dated playground, fence, and paving. A new ADA playground with ramps and subbase was installed for new playground equipment, along with installation of new perimeter fencing with gates and connection to existing building. Project included subdrainage, with storm connection from existing roof drains. The new ADA ramps improved accessibility from the school and public parking areas.

Estelle V. Malberg Early Childhood Center

Construction of new ADA Accessible playground with subbase, drainage, ramps, perimeter fencing...

NACOM installs stadium with site improvements including the construction of a new masonry storage facility, equipped with sub-surface integration of mechanical and electrical systems, situated beneath a 12-row, 132-foot grandstand bleacher structure. Design specifications include an 8x30-foot press box with an integrated canopy, new asphalt pathways, a concrete pavilion, and sidewalks.

Triton High School New Stadium & Site Improvements

Construction of new 132-foot long CMU storage building, new grandstand bleachers, press box with canopy, and mechanical / electrical located underneath bleachers...

NACOM project scope includes full decommissioning of former Natural Gas Fueling Station, removal of all equipment and demolition of all structure supporting equipment. Patch trenches, new subgrade, provide new asphalt paving and concrete site improvements with perimeter fencing to return site to its original condition prior to the station development.

Decommission of Natural Gas Fueling Station

Full decommissioning and removal of all equipment, demolition of all structure, new subgrade, site improvements...

NACOM project scope included the demolition of designated areas and structural infill at the interior of a 300,000 S.F Warehouse Facility.

Lyons & Sons Railcar Pit Infill

Demolition of designated areas and structural infill at the interior of a 300,000 sq. ft. warehouse facility, with infill of 6200 sq. ft. railcar pit...

NACOM project scope includes construction of a new, 2-story 30’ x 10 CMU storage building and press box complete, metal roof panels, mechanical and electrical. All new pre-engineered bleacher system, all new concrete walkways, and grass re-establishment.

City of Salem Athletic Stadium Improvement

Construction of new grandstand bleachers, press box with canopy, and mechanical / electrical located underneath bleachers...

Niagara Falls Air Reserve Station-Taxiway Repairs

A 2-phase project requiring coordination with FAA and Government officials to not interfere with daily operations of the air base.

The work completed includes threshold displacement and reinstallation including all federal guideline coordination; installing temporary PAPI system during construction activities within the RSA; demolish, remove, and replace existing asphalt and concrete pavements located on Taxiway A; remove and replace subbase in identified locations; cut and seal control and construction joints as indicated; asphalt shoulder milling and repaving; final grading along asphalt shoulders.

Grissom Air Reserve Base-Aerial Port Facility

New construction of a 11,830 SF masonry Aerial Port Facility, including include shop space, warehouse space, offices, loading docks, asphalt paving for parking & driveways, utility connections, security fencing, security lighting and exterior site improvements (landscaping, grading and drainage, exterior signage) with vehicular access to the flight line and base supply.

Niagara Falls Air Reserve Station-Physical Fitness Facility

Construction of a new 24,906 sf physical fitness facility including a lobby, administrative areas, locker rooms, gymnasium/basketball court, group exercise area, fitness equipment space, storage space, indoor running track and racquetball courts.

The new construction to be completed includes required site work, caissons, reinforced concrete foundation, steel structure, brick and exterior insulation finish system, roof, fire protection, mechanical, electrical, plumbing, communications, and an asphalt parking lot. Following the completion of the new fitness center, Buildings 855 (existing physical fitness facility) and Building 860 (old base theater) will be demolished, including all hazardous waste remediation for each building, and restoring the area. The project must be completed in multiple phases to compensate for the existing occupied facilities.

Fort Riley-Building 760 Renovations

Renovate historic building 760 to meet anti-terrorism and force protection (ATFP) requirements, including new fire protection and alarm system, building information systems, and energy monitoring and control system (EMCS) connections.

Work also included new interior finishes, electrical, communication and mechanical systems as well as extensive sitework to bring the facility to a new standard for mission critical activities.

Grissom Air Reserve Base-Repair of Taxiway C

Replacement of existing Taxiway C between Taxiway G and Runway 5-23, including intersecting segment of Taxiway F and incidental related work.

Project scope of work consists of demolish, remove, and replace approximately 600,000 SF of existing asphalt and concrete pavements located on Taxiway C; remove and replace subbase in identified locations; cut and seal control and construction joints as indicated; asphalt shoulder milling and repaving; removal and reinstallation of taxiway lighting; final grading along asphalt shoulders.

Fort Riley-Aircraft Parts Storage Warehouse CAB

Supply and coordination of a 10,088 sf pre-engineered building to be erected adjacent to Building 840 following the demolition and removal of existing fencing.

The new building scope of work consists of concrete spread footings; reinforced concrete slab on grade; steel erection and trusses; metal building framing and paneling; SSM roof; overhead doors; new underground utilities (gas, water, electric); new HVAC, plumbing, electrical, communication, security and fire suppression distribution and systems; exterior site improvements including asphalt paving and earthwork.

Del Rio/Eagle Pass Design/Build Border Infrastructure Project

A design build project incorporating the demolition of approximately 4 miles of existing picket style fencing and construction of approximately 4 miles New bollard walls.

Including gates, FC-2 all-weather roads, drainage improvements, new fiber optic cables, three (3) phase power distribution system, lighting, and all necessary supports, Closed Circuit TV (CCTV), Linear Ground Detection System (LGDS), electronic equipment shelters and signage as well as all-weather maintenance and patrol roads.

38 IC LLC Design/Build New Facility

Project includes converting a 15,000 s.f warehouse int a full-service heavy truck maintenance facility including upgraded electrical and mechanical systems, offices, installation of 7 24’ x 14’ motorized sectional hi lift doors.

Installation of exterior lighting, new parking positions, driveways and mill and pave entire property including signage and striping.

48 NMJT LLC Design/Build Site Improvements

Project includes relocation of site lighting, installation of new curbing and paving, signage striping to create 50 car, truck, and trailer parking positions.

19 IC LLC Design/Build Site Expansion

Project includes acquiring additional real estate to meet NJDEP Stormwater regulations, the installation of new stormwater management system to accommodate 100-year storm requirements for multiple building within the Industrial development.

Extensive site improvements including curbing, regrading of site, light and heavy duty paving, signage and striping and new site lighting.

JBMDL-Concrete and Masonry Contractor

New building construction for a Youth Center; excavation, earthwork, and formwork for concrete foundations and building slab.

Set anchor bolts and concrete reinforcement per contract documents; supply and install board insulation; brick veneer and cast stone finishes along building exterior.

Kerry Ct-Design/Build New Facility

Construction of a new 21,000 S.F office/warehouse facility including clearing of site.

Installation of all utilities, storm drainage, well, septic system, concrete footings, foundations, slabs, furnish and erect of a Nucor pre-engineered building system, man and overhead door installations, new storefront entrances including canopies and pylon sign, concrete curbs, sidewalks, and asphalt paving.

Joint Base McGuire-Dix-Lakehurst Youth Annex Building

Construction of new 16,260 square foot facility that will provide 168 school-aged children between the ages of 5-12, afterschool programs, youth activities, and youth support.